Project & Gallery

Our Project Track Record

Name of ProjectDescription of Work
Construction of Singapore Expo Food Village project

Supply, Fabricate,Galvanizing,Deliver and installation of steel structure for roofing,columns,structural

beams, linkway

T07- PUB contract- Deep Tunnel Sewerage SystemSupply,Fabricate Thrust frame,cradle pressure rings and tunnel accessories.
Proposed A&A works for building at serangoon North Ave 4

Supply, Fabricate,Galvanizing,Deliver and installation of steel structure for roofing,columns,canopy,

structural beams, linkway

N103- North South CorridorSteel road barriers, Hoardings, Temporary office drain and gratings, Temporary noise barriers,
T217 Napier stationDismantling of King post at all level – approx 1400 tons
National Archives of Singapore

Supply, Fabricate,Galvanizing,Deliver and installation of steel structure for roofing,columns,canopy,

structural beams, linkway

Proposed A&A works for 37 storey building income @Raffles BuildingSupply Fabricate and installation of steel structure works for cooling tower supports
C883 MRT Line, C885 MRT line ,    Sinming station @ Circle Line

Installation of Noise barrier throughout the project overall boundary Approximate area of 20000 m2,

Lengthwise 2KM approx

GBD- C9061- Gali Batu Depot- DTL 3 – MRTInstallation of Security Fencing, ATO Fencing and all accessories around 2100 m run
T220 – Thomson Line MRT – Great world stationDesign, Supply, Fabrication and Installation of movable Noise Enclosure shed for Launching shaft
T208- Thomason Line MRT- Spring leaf stationStrutting, Lifting hooks, Lifting Beams , Sheet piles, Road barriers Thrust frame, Cradle & miscellaneous,Tunnel steel works
Contract 885 Construction of Prince Edward Station and tunnels for circle line 6Supply fabrication and installationTemporary noise noise control barrier and related steel structure
Contract 883 Construction of Cantonment Station and tunnels for circle line 6Supply fabrication and installationTemporary noise noise control barrier and related steel structure
Proposed Addition and Altration Work on National Archives of Singapore @ no 1 canning riseSupply, fabrication,galvanizing and delivery to site.Installation of Roof ,Staircase ,Ramp,Handrail,canopy ,linkway
Construction of alexandra canel At Smarthmore avenueSupply fabrication and installationTemporary noise noise control barrier and related steel structure
Contract T208 Construction of spring leaf stationSupply,fabrication hot dip galvanizing ,delivery and Installation of lifting beam and lifting hook
Contract T312 Construction of Sungei Bedok StationSupply fabrication and installationTemporary noise noise control barrier
Contract 9061 and 9062 Design and Construction of Additional Stabling Yard At Gali Batu DepotInstallation of Security and ATO fence system (Aroung 5000m)
National Libarary boardSupply,fabrication and installation of steel structure works
Jurong Town CouncilSupply,fabrication,hot dip galvanizing,delievry and installation of coverec linkway
Proposed 5th Storey Commercial building with Aviation attraction facilities(PROJECT JEWEL)Fabrication and delivery of Structural steel beam and Pipes
Jurong Port A&A modification worksFabrication,Delivery and installation works
Proposed Erction of BLK 75,77,81@ JTC CorporationFabrication and installation of bondek sheet,roof truss,steel cloumns
T206- Thomson MRT lineFabrication Strutting – ERSS
Construction of T220 Great World StationStrutting works Fabrication and installation, spreder beam Design, Supply,Fabrication and Installation of Noise Enclosure shed for Launching shaft
Contract T208 Construction of spring leaf stationSupply,fabrication hot dip galvanizing ,delivery and Thrust frame,cradel,crash barrier Installation.
Construction Of T206 Woodland station and woodland ave 12Fabrication steel strutting and waler beams – ERSS contract
T210 Construction of May flower stationGround Anchor waler beam and  Anchor Brackets
T209 Lentor StationSupply and insattaltion of thrust frame and cradle
T221 Havelock stationGround Anchor waler beam and  Anchor Brackets
C 917  SAV   StationSupply, Fabricate and Installation of the Pipe Jacking Pipe welding
EW3 cable tunnel ProjectSupply and insattaltion of thrust frame and cradle and misscellaneous
C917A King Albert Park StationSupply ,Fabricate and installation of the ceiling frame support at concourse level
C918A TKK StationSuplly,Fabrication and delivery of Diesel tank
C927 Bedok Reservoir StationSupply, Fabricate and istallation of Thrust Frame ,Cradle,cooling Tower Structure misscellaneous works
C926 Tampanies West StationSupply, Fabricate and istallation of Thrust Frame ,Cradle,cooling Tower Structure misscellaneous works
Tree House condominiumFabrication and installation of steel tree structure  total 210 tons
Connexion – Hospital projectSupply,Fabrication and installation of steel structure and staircase, Trellis- Approx 300 tons
Jurong Aeromatics ProjectDesign,Supply,Fabrication of Tank working platforms Approx 50 tons
MRT-DTL 3- C917 – Thomson LineShop drawings,Supply,Fabrication , Installation of  Thrust frame ,Total : 200 tons – 4 set ,Supply & fabrication Deck beams – Approx 50 tons
Ware house project ,Tuas street 5Proposed erection of single storey factory complex with Acillary office with mezz floor Installation of steel structure- 400 tons Roofing works – 3000 m2 Cladding pre cast wall – 5000 m2 Fabrication and installation of steel works
HillTOP Condominium- Orchard roadTrellis, Linkway,Entrance canopy, and Guard house roof- 120 tons Fabrication and Installation
C854 -MRT – Entrance canopyFabrication and installation of  8 entrance steel structure 250 tons
SBPL/ Seraya / Furnace platformSupply , Fabrication, Installation Fabrication of Roofing and structural for cylinder shed  45 tons Welding of piping joints for utility line in
Exxon mobil project- SPT- Jurong IslandInstallation of staircase and platforms
Contract C 915- DTL -Downtown Line MRTProject: Walking Bridge Crane beam & Deck beams Piling frame
JSS- expansion of lubrication plant -Exxon Mobil Ltd at Pioneer RoadInstallation of pipe rack PR 01 toPR32.Inside the running plant.- Approx 400 tons
C916 – MRT- DTL 2-Downtown Line MRTFabrication of Built up beams 900mm x 75mm thick 120 tons .Fabrication of built up beams at various sizes approx 150 tons
Horizon Terminals- Jurong IslandImprovement of FRP grating platforms on tanks roof top for 30 tanks of various dia from 18m to 40m. Supply,Fabrication and installations of cross over platforms ,walkways,bund wall crossings
C916 – MRT- DTL 2-Downtown Line MRTFabrication and installations- ERSS – of Traffic decking beams and structure TOTAL  1550 tons.TWIN pipe supports fabrication and installations 140 tons pipe line 1k.m x 2lines x 2.3 diameter
Sky Eleven condominium.Fabrication and erection of steel structure at Entrance canopy,Trellis,Car park link way, Club house and Guard house roof- 210 tons approx
Down down line – DTL 2- Beauty World StationTemporary works Civil works and concreting works
HDB block – jurongFabrication & installation of Staircase,Aircon ledge,Parapet wall handrailing works 140 tons
International Cruise CentreSupply,Fabrication,Painting and delivery of steel structure platforms c/w chequered plate Form work supports, clamps and handrailings 180 tons
Smell Abatement Facility – Pulav BukumSupply,Fabricate,Galvanize and deliver to site 100 tons
Horizon TerminalsRegular maintanance works inside the terminal
Helios TerminalsPlatforms and fork lift drive way constructions Walkway structure works- Fabrication and Install
Exxon Mobil -SPT projectFabrication of SS piping works- 6″, 10″, Pipe threading works for tank fire fighting line Pipe rack structure fabrications- utilities package Valve/working platforms fabrications-IC&T package machining and threading works Fabrication of Man hole flanges Boundary fencing works
SBRM, Shell -Pulav BukomSupply and fabrication of steel pipes,chequered plate platforms.angle bar frames , gratings , miscelanious steel items 80 tons
Marina Bay Sands – IRAssembly,site welding and Erection of structural steel work at south podium for Mice & cat walk and Roof Structure- South Plant Ball Room 600 tons
Sentosa -IR- integrated ResortsFabrication and Erection of Supporting steel structure works for Escalator area Wall & Column cladding steel structure works, 250 tons
SPT project- Temporary Fabrication Yard constructionShifting of materials from island to shop,dismantling of structures erected over there Reinstatement of yard.Erection of the crane structure and roofing works
School of Arts projectAssembly of Truss and welding works ,all Heavy trusses 50m Long with segments ,(Part of the Work)
Helios TerminalsSupply and,fabricate and installation of gratings and embedded plates construction of man hole wall Supply,Fabricate,paint and installation of Jetty Gate with security system 170 tons approx ,Precasting of concrete ,Bund wall panels stairs, Pipe supprots,
Heraeus-Tuas Supply,fabricate ,installation ,
frames for shutter doors
Genentech – Tuas  Plant Supply,Fabricate,Galvanize,
Installation ,of Door casing cover channels ,Approx 30 tons
Horizon terminal Phase -3 400 tons Supply,Fabrication ,Painting and delivery of tank Jigs and
Fixture- Jewellary items
Fabrication of FRP tank leak
deduction sump for 23 tanks Supply,Fabricate & delivery of inspection hatch door for all
23 tanks ducts for 114 pcs Supply,fabrication and delivery
 of roof vent Fabrication and installation of handrails Type
 A abd B for all tank stair case
area Casting of staircase
foundations for 30 tanks
 Misellanious Steel structure platforms fabrications
Vopak terminals Drain construction works
for Vopak terminal phase 3
C7,B, Cast in Situ, type
drains Gratings and
supports fab and install
Helios Terminal Welding of HDPE pipes and installation of HDPE pipes in underground Approx 3K.M. 
 Dia 100mm to 300mm 
Bund wall construction :
Fabrication of Form Works
 supports, side wall panels, etc Renovation of blasting chamber
CWT Engineering Removal of all damaged rubber
 and concrete Plastering of wall approx 500M2 Fixing of
rubber 5mm thick
Horizon terminals- Phase -2 Fixing of aluminium steps on
 tank roof walk way in
existing live plant
About 1800 pcs , at 30 tanks Fabricationof manhole
flanges, covers Fabrication and installation floor concreting  of temporary sheds for storage
 use.all by 25mm , 40mm
,50mm SHS Sizes: 6mx10m ,
10m x20m,and various sizes.
Helios TerminalWelding of HDPE pipes and installation, of HDPE pipes in underground Approx 3K.M.  Dia 100mm to 300mm Bund wall construction: Fabrication of Form Works supports, sidewall panels, etc
CWT EngineeringRenovation of blasting chamber  Removal of all damaged rubber and concrete Plastering of wall approx 500M2 Fixing of rubber 5mm thick
Horizon terminals- Phase -2Fixing of aluminium steps on tank roof walk way in existing live plant About 1800 pcs, at 30 tanks  Fabrication of manhole flanges, covers Fabrication and installation, floor concreting of temporary sheds for storage use. all by 25mm, 40mm,50mm SHS Sizes: 6mx10m , 10m x20m, and various sizes. Concreting of staircase and fixing of handrails, Painting of Tank foundations: 500m2
Bovis Pharmechuticals-Lonza projectSupply and fabrication of Drip pans stainless steel pans size 6m x 5m x 3mm total 16 Units
Helios TerminalsFabrication of embedded plates and angles for pipe support foundation.         Fabrication of Electrical cable supports. Fabrication of I beam structure for temp.shedFabrication of canteen benches and tables   Concreting of staircase and fixing of handrails, Painting of Tank foundations: 500m2
Installation of Pipe BrigesInstallation of Pipe bridge structure along Banyan avenue- Jurong island
Tank Roofing worksAssembly and installation of Aluminium dome roof on oil tanks -2 tank
Project: Hin leong terminalAssembly and installation of Aluminium dome roof on oil tank 40 m and 50m dia
Horizon terminalsConstruction of temporary Workshop at site. Civil construction of Beams, structure sump, machine foundations, drainages
Blasting Machine FoundationDesign and Build the Blasting machine foundation at No.12, Gul road. Foundation size: 3m depth and 12 m width x 10m wide
Helios TerminalsTo supply, Fabricate, galvanize and installation of fencing and Gate for Boundary.   Green colour standard fence ht 2.1m with vertical post and barbed wire Qty; 2. 5 K.M
B.L.P.T project, Jurong IslandFabrication and supply of jigs and fixture and machining items saddle supports,Lifting temporary structure Fabrication of tripoid and other temporary structures, Form work steel frames , Supply of roofing sheet and roofing work for extension area Assembly and erection of aluminium Dome roof.Erection of fire water pipe and supports around the tank 4″ and 6″
Ulu Pandan Newater project-NursaryFabrication and erection of crane run way  Columns, beams and bracings, Fabrication and erection of  monorail crane supporting structure.
Novaritis pharmachutical plantFabrication of supporting structure for rolling shutter 18M height X 45M long Installation of pipe supports and erection of
Horizon terminalsCooling water system and foam piping system at tankage. Civil work: Concrete staircaase for 30 tanks and supply, fabricate, galvanizing and Site installation works. Painting of tank foundations surfaces and boot seal areas    Modification of tank roof aluminium staircase for 30 tanks,Fabrication of Foam Nozzle deflector duct by aluminium sheet and installation inside the tank at 18m height
Tank Store Pte LTdSupply and fabrication of Tank jigs and Fixtures one coat primer paint
Vopak- Pulav SebarakModification of pipe rack structure at Vopak Terminal at Pulav sebarok